Satellite Regasification Plant

UNDERGROUND

LNG Satellite Regasification Plants (PSR) standard model

They are designed to meet medium-high consumption needs.
  • Reliable and robust design

  • tailor-made solution

  • Plant remote management

GEcrio covers all aspects of an implementation: design, operation and maintenance.

Our Support

  • Unit sizing and site selection
  • Advice on obtaining permits and licenses
  • Supervision of the installation, tests and adjustments.
  • Remote monitoring of unit performance and operation -optional.

PSR GNL

MODEL | Standard
OBJECTIVE | Consolidated demand
SERVICE | Natural gas

5000

Nm3hr (*)

100

m3 (**)

(*) Maximum consumption, from
(**) LNG storage, from
  • 1

    Surtidor GNC
  • 2

    Surtidor GNL
  • 3

    Cubeto
  • 4

    Módulo GNC
  • 5

    Módulo GNL
  • 6

    Depósito GNL
  • 7

    Vaporizador ambiental
  • 8

    Luminaria ATEX
  • 9

    Interface de carga

Basic features

Nominal capacity, from …. 5,000 Nm3/hr Consumption pressure, from 0.3 to …. 19 bar
Other pressures also available

Functioning

  • unattended management

  • Advanced process control

  • Comprehensive boil-off management

  • Telemetry and SCADA (optional) integrated

  • Ejecutamos proyectos especiales

Common elements

  • Management based on dedicated PLC and computer.

  • Interfaces: local HMI .

  • Integrated management of: process settings, alarms.

  • Communication via GPRS

Optional Items

  • Automatic load management

  • Automatic cold start management

  • Gas sensors, video surveillance

Equipments

  • Driving and management of vents

  • SCADA management interface

Design criteria

Modular

Standardization of equipment and capacities. Standard container platforms 20-40 feet

Express

Maximum 3 days for assembly and start-up !!! Skid solutions, even shorter term

Plug&Play

Factory tested solutions. ready to use

Todo en Uno

Systems with a high degree of integration, ready to be used in emergency situations, repair, pilot projects
Homologations

ADR REPAIR WORKSHOP

File number 2015.210 Installation of a repair shop for tankers for the transport of dangerous goods by road ADR

INSTALLER / REPAIRER

File number RASIC-005006000, Industrial security agent Gas, pressure equipment, oil equipment, electricity,

ADR DEGASSING

File number 2016.008. Installation of internal degassing of tanks for the transport of dangerous goods by ADR road.